Technical Documents
The Town Planning Ordinance as amended in 2023 takes effect on 1.9.2023. Representers/commenters/further representers of the plans exhibited before 1.9.2023 should make reference to the “Guidance Notes on Attending the Meeting for Consideration of Representations, Comments and Further Representations under the Town Planning Ordinance” promulgated before 1.9.2023 (please click here).
Assessment Criteria
Assessment Criteria | Download |
---|---|
Assessment Criteria for Considering Applications for Solar Photovoltaic System made under Section 16 of the Town Planning Ordinance (Revised on 7 October 2022) |
|
Interim Criteria for Consideration of Application for New Territories Exempted House/Small House in New Territories (Revised on 7 September 2007) |
Guidance/Technical Notes
Guidance/Technical Notes | Download |
---|---|
Technical Notes on Submission and Implementation of Landscape Proposal for Compliance with Conditions for Approved Applications for Open Storage and Port Back-up Uses under Section 16 of the Town Planning Ordinance |
|
Guidance Notes on Attending The Meeting For Consideration of Representations Under The Town Planning Ordinance |
|
Guidance Note on Compliance with Planning Condition on Provision of Fire Safety Measures for Commercial Uses in Industrial Premises |