Enhancing Land Supply Strategy : approach to increase land supply including reclamation
Reclamation outside Victoria Harbour and outside Victoria Harbour and rock cavern development.
Rock Cavern Development The study was completed in 2014. The Board also noted
that separate studies to examine the feasibility of the
In 2011, the Development Bureau, CEDD and PlanD jointly selected reclamation and rock cavern development sites
commissioned the study on Enhancing Land Supply would be carried out.
Strategy to assess the feasibility of enhancing land supply
through reclamation outside Victoria Harbour and rock Planning and Engineering Study on Future
cavern development. The Board was briefed on 26 April Land Use at Ex-Lamma Quarry Area at Sok
2013 on the Stage 2 Public Engagement, the proposed Kwu Wan, Lamma Island – Feasibility Study
land reserve concept, and the potential reclamation and
rock cavern development sites. The five reclamation In January 2012, PlanD and CEDD commissioned the
sites were at Lung Kwu Tan, Siu Ho Wan, Sunny Bay, Planning and Engineering Study on Future Land Use at
Tsing Yi Southwest and Ma Liu Shui. Moreover, the Ex-Lamma Quarry Area at Sok Kwu Wan, Lamma
relocation of Diamond Hill Fresh Water and Salt Water Island – Feasibility Study to examine the future land use
Service Reservoirs, Sai Kung Sewage Treatment Works and explore the development potential of the Ex-Lamma
and Sham Tseng Sewage Treatment Works to caverns Quarry site, including residential development and other
was also proposed. Members generally supported compatible uses.
the provision of a land reserve and the multi-pronged
建議發展大綱草圖
Draft Recommended Outline Development Plan
TOWN PLANNING BOARD REPORT 2012-2014 46