3 其他主要工作
Other Major Work
Planning and Engineering Study for Housing principles for the developments in Yuen Long South.
Sites in Yuen Long South – Investigation Members provided views on the compliance with the ‘no
net increase in pollution load to the Deep Bay’ requirement,
In November 2012, PlanD and CEDD jointly commissioned formulation of a consultation strategy to engage the public
the Planning and Engineering Study for Housing Sites and relevant stakeholders, and the concerns regarding the
in Yuen Long South – Investigation to examine the implementation mechanism including the reprovisioning
development potential of the degraded brownfield land of the affected open storage yards/rural workshops/
in Yuen Long South for housing development and other warehouses. The Stage 2 Community Engagement was
uses, with supporting infrastructure and community on the PODP. Members provided views on the capacity
facilities, and to improve the existing environment. of the planned infrastructure for the proposed population,
the relocation and implementation of the existing open
Members were briefed on the study on 26 April 2013 storage and rural industrial uses, and the revitalisation of
and 6 June 2014 respectively as part of the Stage 1 and Yuen Long Nullah as a local character for consideration
Stage 2 Community Engagement of the study. During the in the preparation of the draft RODP in the next stage of
Stage 1 Community Engagement, the Board was briefed the study.
on the constraints, opportunities, key issues and guiding
Overall Planning and Design Framework
53 TOWN PLANNING BOARD REPORT 2012-2014