Part   3  Other Major Work of 2015-2017             Town Planning Board Report 2015 - 2017  33



























                                   Existing Site Condition of the Carrick

                                   Hung Shui Kiu New Development Area

                                   HSK NDA will provide about 61,000 new flats to accommodate an additional
                                   population of about 176,000, and will produce about 150,000 new job opportunities,
                                   with the first population intake expected in 2024. The NDA is of territorial
                                   significance and it will be the main source of land supply to meet Hong Kong’s long-
                                   term development needs. The HSK NDA Planning and Engineering Study (HSK NDA
                                   Study) was commissioned jointly by CEDD and PlanD with a view to formulating a
                                   planning and development framework for the implementation of the NDA. Three
                                   stages of public engagement were conducted from 2011 to 2015 and a Revised
                                   RODP was formulated under the HSK NDA Study. On 23 September 2016, the Board
                                   was briefed on the Revised RODP formulated for the HSK NDA.


                                   A new OZP was prepared to take forward the recommendations of the HSK NDA
                                   Study. On 5 May 2017, the Board agreed that the OZP for HSK NDA was suitable for
                                   exhibition for public inspection under Section 5 of the Ordinance. On 26 May 2017,
                                   the draft Hung Shui Kiu and Ha Tsuen OZP No. S/HSK/1 was exhibited. A total of 117
                                   valid representations and 338 valid comments were received. The representations
                                   and comments were considered by the Board in January and February 2018.






























                                  Draft Hung Shui Kiu and Ha Tsuen OZP    Boundary of the Hung Shui Kiu and Ha Tsuen OZP
   30   31   32   33   34   35   36   37   38   39   40